Images !
Asbestos fire blanket |
Pieces of AIB |
Perforated AIB ceiling tiles |
Suspended AIB ceiling tiles in a corridor |
Asbestos containing floor tiles in a corridor |
Asbestos cement downpipe, hopper and profile sheet |
Pieces of AIB |
Damaged asbestos panelling |
Asbestos cement roof (damaged exterior) |
Torn asbestos pipe lagging |
Wall with trowelled loose asbestos |
Damaged asbestos pipe lagging and debris |
Damaged asbestos lagging on hot water pipes |
Asbestos rope used as insulation on a pipe |
Pipe insulated using both asbestos lagging and rope |
Unscrewing of an AIB ceiling tile |
Careful handling of an AIB ceiling tile during removal |
Sprayed 'limpet' asbestos on the underside of an asbestos cement roof |
Sprayed 'limpet' asbestos which been partly removed |
AIB window panelling |
AIB window sill |
Asbestos textured coating |
Asbestos cement drainage pipe (downpipe) |
Asbestos cement external building panel |
Asbestos panelling around gas meter |
Asbestos panelling inside heater cupboard |
AIB soffit Board |





























